Customer Won't Pay? Before Anyone Picks Up a Sledgehammer, Here's How Washington Contractors Actually Get Paid
The conversation
On Oct. 15, an X account reposted a clip of a crew breaking up a freshly poured concrete patio with sledgehammers. According to the caption, the homeowner signed a contract and then allegedly refused to pay once the job was done. By Oct. 18 the post had close to 2 million views and more than 700 replies.
The post doesn't say where or when the video was shot, and we couldn't verify either. Clips like this circulate every year or so. The best-documented one is from Ellesmere Port, England, in May 2019. A landscaping crew smashed a garden after claiming the customer hadn't paid £7,300 for it, and police treated it as a civil matter and made no arrests, according to Metro.
The replies split the way you'd expect. One camp cheered the crew. The other asked whether the crew was even licensed, and said a properly licensed contractor already has better tools than a hammer. On Reddit, "customer's refusing to pay — lien rights?" is a question that comes up again and again on r/GeneralContractor.
The second camp is closer to right. Washington is a good state to explain why: its system rewards contractors who keep their paperwork in order and gives very little to those who don't.
Why the hammer is the worst option
Washington's lien statute gives an unpaid contractor a lien "upon the improvement" for the contract price (RCW 60.04.021). The patio, the roof or the addition itself is your security, so destroying it destroys your leverage. It can also expose the crew to property-damage claims and criminal charges. If you're ever tempted, call a construction attorney first.
Step 1: Your registration is what lets you sue
Under RCW 18.27.080, a contractor can't bring or maintain any court action to collect payment for work that requires registration unless it proves it was a duly registered contractor with a current, valid certificate at the time it entered the contract.
Being "substantially" compliant isn't a loophole. The court won't find substantial compliance unless all three of these were true the whole time:
- L&I had the contractor's required information on file,
- a bond or other security was in force (RCW 18.27.040 sets it at $30,000 for general contractors and $15,000 for specialty contractors), and
- the required insurance was in force.
A lapsed bond in the middle of a job can cost you the right to collect at all. Check your own status with L&I's online contractor lookup before you sign the next contract, not after the check bounces.
Step 2: Hand over the disclosure statement before you start
RCW 18.27.114 requires a "Notice to Customer" disclosure statement, signed by the customer before work starts, on:
- residential jobs (four or fewer units, plus accessory structures on that property) of $1,000 or more, and
- commercial jobs of $1,000 or more but less than $60,000.
You have to keep the signed copy for three years. Subsection (4) is the one that matters when you're owed money: a contractor covered by the section can't bring or maintain a lien claim on that contract without alleging and proving it gave the customer the disclosure. Almost any patio job clears the $1,000 threshold.
Step 3: Know whether you need a pre-lien notice
The "notice of right to claim a lien" in RCW 60.04.031 is mostly for people who don't contract directly with the owner. A prime contractor hired directly by the owner doesn't need one. A contractor who contracts directly with the owner-occupier on a repair, alteration or remodel of an owner-occupied single-family home has a lien "for the full amount due" with no pre-lien notice. Subcontractors and suppliers on that same house do need to give notice, and their recovery is limited to money the owner hasn't yet paid the prime.
Step 4: Record the lien within 90 days
Under RCW 60.04.091, the claim of lien has to be recorded in the county where the property sits no later than 90 days after you last furnish labor, materials or equipment. The claim must give your name and address, the first and last dates you worked, who owes you, the property description, the owner (or "unknown"), and the principal amount. It has to be signed under penalty of perjury and acknowledged.
Two practical notes:
- Your last day of work is what starts the clock. Write it down the day it happens, with photos and a dated invoice.
- Don't pad the number. Under RCW 60.04.081, an owner can ask the court to release a lien that's "frivolous and made without reasonable cause" or reduce one that's "clearly excessive," and the lien claimant can be ordered to pay the costs and attorneys' fees.
Step 5: Enforce it within 8 months
A recorded lien doesn't last on its own. Under RCW 60.04.141, it stops binding the property eight calendar months after recording unless you file a foreclosure action in that county's superior court within that time and serve the owner within 90 days of filing. If the case isn't taken to judgment within two years, the court may dismiss it.
Attorneys' fees can go either way. Under RCW 60.04.181(3), the court may award the prevailing party, plaintiff or defendant, its recording costs, title report, bond costs and reasonable attorneys' fees. That's a strong reason to send a firm, documented demand before you file anything.
The 10-minute version
| When | What Washington requires | Statute |
|---|---|---|
| Before you sign | Current registration, continuous bond ($30k GC / $15k specialty) and insurance | RCW 18.27.080, .040 |
| Before work starts | Signed "Notice to Customer" disclosure on covered jobs ($1,000+) | RCW 18.27.114 |
| During the job | Pre-lien notice if you're a sub or supplier (not usually the prime) | RCW 60.04.031 |
| Within 90 days of last work | Record the claim of lien in the property's county | RCW 60.04.091 |
| Within 8 months of recording | File to foreclose; serve the owner within 90 days of filing | RCW 60.04.141 |
What the replies got right
Most of the replies were really about leverage, and in Washington your leverage comes from the work you did before the dispute: staying registered, keeping the bond and insurance continuous, getting the disclosure signed, and logging your last day on site. A crew that does those four things can collect without touching the patio. A crew that skipped them may not be able to collect at all.
This article is for general information and isn't legal advice. Verify current requirements with your state licensing board or a licensed attorney.
IQS — connecting construction businesses with state-licensed qualifiers.
Sources
- X — Oct. 15, 2026 repost of the concrete-patio clip (origin unverified)
- Metro — Gardeners destroy brand new patio "after homeowner failed to pay them" (May 3, 2019)
- r/GeneralContractor — "Customer's refusing to pay - Lien Rights?" (linked by title only)
- RCW 18.27.080 — Registration prerequisite to suit
- RCW 18.27.040 — Bond or other security required
- RCW 18.27.114 — Disclosure statement required; prerequisite to lien claim
- RCW 60.04.021 — Lien authorized
- RCW 60.04.031 — Notice of right to claim lien
- RCW 60.04.081 — Frivolous claim procedure
- RCW 60.04.091 — Recording; time; contents of lien
- RCW 60.04.141 — Lien duration; procedural limitations
- RCW 60.04.181 — Rank of lien; attorneys' fees
- Washington L&I — Register as a Contractor
Share this article
Need a licensed qualifier for your business? Request a qualifier match. Hold a license and want to qualify a company? Start here.
Follow International Qualifier Search for more on Facebook, LinkedIn, YouTube, and Instagram.
